Install Timeline
Enter the size of the green, the shape, the access, the ground and the weather. See a day-by-day chart from marking the yard to the first putt.

How Long Will It Take? Install Timeline
- Days of work-
- Dig and base done-
- Turf goes down-
- First putt-
Saved. It travels with the form at the bottom of this page.
A typical schedule, not a promise. Weather, access, soil and materials change the timing, and we confirm the dates with the written plan.
What the numbers mean
- Steps in orderMarking, digging, base, turf and finishing each get their own time.
- Site mattersAccess, soil and weather can add days.
- First puttThe chart shows the day the green is ready to play.
About this tool
Is this a promise?
No. It is a typical schedule. We give exact dates with the written plan.
Why do tight gates add time?
Materials and machines are moved by hand, which takes longer.
Can I use it right away?
Yes. Once the infill is brushed in, the green is ready to play.
When the plan says it is time
BuildTurn-Key Putting Green PackagesTurn-key putting green packages that handle design, base, turf, edges and finish in one plan, with a clear scope, a schedule and a single contact.See the service
BuildExcavation and GradingExcavation and grading that removes old turf and soil, sets the shape and slope and leaves a clean, firm subgrade ready for stone.See the service
BuildTurf Seaming and InstallationTurf seaming and installation with tight, invisible seams, stretched, secured turf and a clean finish that rolls smooth from edge to edge.See the service Ready to put a green in your yard?
Call or text Golfing Greens, or send the form, and tell us about the space. We reply with clear next steps and a design that fits your yard.