How Long Does a Putting Green Take to Build?

Key takeaways

  • Design and layout come first
  • Excavation and base take most of the time
  • Turf goes down in a day or two
  • Weather and access can change the plan

A typical backyard green is built in a few days once the design is approved.

Day one

Mark the outline, strip the turf and dig to depth.

Next

Install drainage, build the base and shape the contours.

Finish

Lay turf, seam it, set the edges and cups and brush in the infill.

What changes it

Size, slope, soil and weather can add time. Our Install Timeline shows a typical schedule.

Related services

Questions about your own yard? Call or text (800) 207-0499, or use the form below.

Schedule an estimate

Let's put a green in your yard.

Tell us about the yard or the property and the green you picture. We read every message and reply with clear next steps and a time that fits your day.

  • Where the green would go, how much space there is, who will play and the look you like. A photo of the yard is perfect
  • Your city, the kind of property and anything you added to your plan or saved from a Green Lab tool
  • A clear design and price before any digging starts, and a roll test and a walk-through when the green is done
Prefer to talk? Call or text(800) 207-0499

Your estimate request

Prefer to type? Text your request. We only use your details to respond to your request.